首页> 外国专利> RIVER DAMLESS HYDROELECTRIC POWER PLANT WITH STEPPED CONCENTRATOR AND VERTICAL BUCKET LONGLINE HYDROTURBINE

RIVER DAMLESS HYDROELECTRIC POWER PLANT WITH STEPPED CONCENTRATOR AND VERTICAL BUCKET LONGLINE HYDROTURBINE

机译:带阶梯式浓缩器和立式桶长线水轮机的河流无害水力发电厂

摘要

FIELD: power industry.;SUBSTANCE: technical solution consists in artificial narrowing by a ground bridge of a river bed and creating concentration of kinetic energy of the water flow and in further using a vertical bucket longline hydroturbine in work. The hydroelectric power plant consists of a hydroturbine, generator, transformer, auxiliary and other equipment. Artificial narrowing of the river bed is achieved by a ground jumper and a water intake (1) in the form of a truncated cone or a prism shape . A turbine pipeline is connected to the water intake (1) with intermediate concentrators (2) in the form of a truncated cone shape. The water flow, passing through the turbine pipeline with concentrators (2), enters the distributors and further into the nozzles of the hydroturbine through the outlets and has the velocity and kinetic energy necessary to ensure the operation of the vertical bucket longline hydroturbine of the installed capacity. To prevent the entry of floating waste, wood and other wastes into the turbine pipeline, protective barriers (3) are installed in front of the water intake of the turbine pipeline in the form of gratings, grids, etc. preventing the waste penetration into the turbine pipeline. To ensure the fish passage to spawn, a bypass (4) with basis of spandrel is installed parallel to the turbine pipeline, through which the fish during the spawning season passes through the HPP. A fish-farm can be placed on the bypass. The inlet of the bypass is covered by shields or other devices, the normal position of which is closed, and they are opened only for the period of the fish passage during spawning.;EFFECT: increasing the speed of water flow ensures the operation of a HPP year-round, there will be no negative impact on the environment.;2 dwg
机译:领域:电力工业;实质:技术解决方案包括通过河床的地桥进行人工变窄并产生水流动能的集中,以及在工作中进一步使用垂直斗式延绳式水轮机。水力发电厂由水轮机,发电机,变压器,辅助设备和其他设备组成。河床的人工变窄是通过地面跳线和截锥或棱柱形的进水口(1)实现的。涡轮管道通过截锥形的中间浓缩器(2)连接到进水口(1)。水流通过带有浓缩器(2)的涡轮机管道,进入分配器,并进一步通过出口进入水轮机的喷嘴,并具有确保所安装的垂直斗式延绳式水轮机运行所需的速度和动能。容量。为防止浮动废物,木材和其他废物进入涡轮机管道,在涡轮机管道进水口的前面安装了栅栏,格栅等形式的防护栅栏(3)。涡轮管道。为了确保鱼类通过产卵,在与涡轮机管道平行的位置安装了一个基于跨度的旁通管(4),产卵季节中的鱼类将通过HPP穿过该旁路。可以将鱼场放在旁路上。旁路的入口被防护罩或其他装置遮盖,其正常位置是关闭的,并且仅在产卵期间在鱼通过期间才打开。;效果:提高水流速度可确保HPP全年,不会对环境造成负面影响。; 2 dwg

著录项

相似文献

  • 专利
  • 外文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号