首页> 外国专利> METHOD TO INCREASE FORMATION HYDROCARBON YIELD AND INTENSIFY OIL-GAS-CONDENSATE PRODUCTION BY MEANS OF FORMATION RADIAL PENETRATION WITH WATER JET

METHOD TO INCREASE FORMATION HYDROCARBON YIELD AND INTENSIFY OIL-GAS-CONDENSATE PRODUCTION BY MEANS OF FORMATION RADIAL PENETRATION WITH WATER JET

机译:射流径向渗透法增加地层油气产量和强化油-气凝析的方法

摘要

FIELD: oil and gas industry.;SUBSTANCE: method includes installing into the well a high-strength tubing, a diverter with inner channel extending therethrough, tying and possible thereof orientation in space in the interval of the lower level drilling of lateral wellbores, sealing the wellhead, installing downhole equipment comprising a water jet nozzle, control unit of the wellbore path, navigation system, working flexible tubing, a device for redistribution of flow, return valve feeding the flexible tubing, supplying liquid into the inter-string area of the tubing/flexible tubing, moving the water jet nozzle through the sealing device. Through the diverter, in contact with rock, drilling of planned length radial wellbore is conducted using the navigation system for monitoring actual position of the wellbore in the formation, and with using the control unit of the wellbore path to provide wellbore drilling along the planned path. After driving the working flexible tubing string with the nozzle through the formation, removal from the formation and well flushing is carried out up to complete discharge of slime. By actuation of the mechanical turning device, the diverter is moved to another plane. The work cycle is repeated for the next lateral wellbore. Milling of a separate port for each lateral wellbore is carried out immediately before performing the main operation for driving lateral wellbores through the diverter. When drilling the lateral wellbore, the wellbore path is determined and changed by supplying the working flexible tubing with wellbore path control unit and the navigation equipment. In order to perform drilling of radial wellbores at the following levels, the supply and working flexible tubing is extracted from the well, tubing is removed from the mechanical anchor, fitting pipe of the tubing that was preinstalled and equal to the length of the transition to the next level is removed, the tubing is seated on the mechanical anchor, and the working flexible tubing with navigation system, control unit of the wellbore path, water jet nozzle is run in into well, after that the operation for drilling of radial wellbores is repeated.;EFFECT: increased productivity of wells and hydrocarbons recovery factor, possibility to conduct address action on the formation, possibility to conduct intensification without effecting on string cement support with considerable pressure drop and chemical destruction, possibility to stimulate the formation by a significant pressure drop or chemical failure, cleaning the wellbore when drilling thereof.;3 cl, 2 dwg
机译:领域:石油和天然气:方法:包括在井中安装高强度油管,带有内部通道延伸通过的分流器,在侧向井眼的下层钻探,密封之间进行绑扎以及在空间中可能的定向井口,安装井下设备,包括注水喷嘴,井眼路径控制单元,导航系统,工作的挠性管,流量分配装置,向挠性管供料的回流阀,将液体供应到井口的管柱间区域管/挠性管,将喷水嘴移动通过密封装置。通过分流器,与岩石接触,使用导航系统进行计划长度的径向井眼的钻探,以监测地层中井眼的实际位置,并使用井眼路径的控制单元沿计划的路径提供井眼钻探。用喷嘴将工作的挠性管柱穿过地层驱动后,将其从地层中取出并进行井眼冲洗,以完全排出粘泥。通过机械转向装置的致动,转向器被移动到另一平面。对下一个侧向井眼重复工作周期。在执行用于驱动侧向井眼通过分流器的主要操作之前,立即对每个侧向井眼进行单独的端口铣削。在钻侧井眼时,通过为工作的挠性管提供井眼路径控制单元和导航设备来确定和更改井眼路径。为了在以下水平上进行径向井眼的钻探,从井中抽取供应和工作的挠性管,从机械锚,已安装的管的装配管中取出管,并使其与过渡段的长度相等。移至下一层,将油管固定在机械锚上,然后将具有导航系统,井眼路径控制单元和注水喷嘴的工作挠性油管插入井中,然后进行径向井眼的钻井操作。效果:提高了井产量和碳氢化合物采收率,可能对地层进行地层作用,可能进行强化而不会影响带压降和化学破坏的管柱水泥支撑,可能通过显着压力刺激地层掉落或化学故障,在钻井时清洁井眼; 3厘升,2载重吨

著录项

  • 公开/公告号RU2642194C2

    专利类型

  • 公开/公告日2018-01-24

    原文格式PDF

  • 申请/专利权人 POPOV PAVEL IVANOVICH;

    申请/专利号RU20160118801

  • 发明设计人 POPOV PAVEL IVANOVICH (RU);

    申请日2016-05-16

  • 分类号E21B7/06;E21B29/06;E21B43/11;E21B43/16;

  • 国家 RU

  • 入库时间 2022-08-21 12:35:51

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号