首页> 外国专利> METHOD OF MULTIPLE HYDRAULIC FRACTURING OF FORMATION IN OPEN INCLINED WELL HOLE

METHOD OF MULTIPLE HYDRAULIC FRACTURING OF FORMATION IN OPEN INCLINED WELL HOLE

机译:斜井眼地层水力压裂的多种方法

摘要

FIELD: mining.;SUBSTANCE: invention relates to methods of hydraulic fracturing in open boreholes of horizontal wells that have opened up a multi-layer productive oil reservoir with low filtration-capacity properties with plantar water in carbonate rocks. Method includes drilling a well in a productive formation, determining the reservoir properties and identifying reservoir intervals with low reservoir rock properties, running the tubing string into the well, performing interval HF in an open wellbore by forming perforations and cracks by injecting a gelled fracturing fluid. At the mouth of the well, the following arrangement is set up from the bottom of the pipe string: a plug, a jet nozzle with nozzles, a bypass valve, a shank, a process packer; run the pipe string with the arrangement into the inclined wellbore so that the nozzles of the jetting nozzle are located opposite the interval with low filtration and capacitive properties corresponding to the upper productive formation, carry out HF in this interval, fracturing is generated by pumping a gelled liquid, which is used as the gelled acid, and fixing the fracture with proppant, at the end of the HF, move pipe string to the next interval with low filtration-capacitive properties corresponding to the underlying productive formation, and carry out HF with fracture formation and proppant crack attachment, likewise moving the pipe string with the arrangement to the bottom of the well, perform HF in the remaining intervals with low filtration-capacitive properties in the corresponding lower-lying productive formations, and with each subsequent execution of the interval HF, the length of the formed fracture is reduced by reducing the volumes of injected gelled acid and the concentration of proppant to fix the formed fracture in each interval of the HF, and a 40/70 mesh proppant is used, after the completion of the HF, a ball is dropped into the tubing string, the pressure in the tubing string is sufficient to break the shear bolt of the bypass valve, while the relief valve sleeve moves downwardly and seals the nozzles of the jetting nozzle from the inside, plant the technological packer in the cased part of the well and develop the well with a decrease in the liquid level to 1,000 m, with the pumping of liquid from the borehole into the chute tank in a volume of 25 m3, with sampling at pH, if the pH value is less than 4, continue pumping to a pH of more than 4, with sampling every 10 m3 of the evacuated liquid, after which the development of the well is stopped, the process packer is unpacked and the tubing string is removed with the assembly from the well.;EFFECT: technical result is increased efficiency of the method in a multi-layer reservoir with plantar water.;1 cl, 3 dwg
机译:用于水平井的裸眼水力压裂的方法技术领域本发明涉及在水平井的裸眼中的水力压裂的方法,该水平井在碳酸盐岩石中利用plant水打开了具有低过滤能力的多层生产油藏。方法包括在生产地层中钻探一口井,确定储层特性并确定储层岩石特性低的储层间隔,将油管柱运入井中,通过注入胶凝的压裂液形成孔眼和裂缝来在裸眼井眼中进行间隔HF 。在井口处,从管柱的底部开始进行以下布置:塞子,带喷嘴的喷嘴,旁通阀,杆,过程封隔器;将布置好的管柱伸入倾斜的井眼中,使喷嘴的喷嘴位于与较低的过滤间隔相对的位置,并对应于较高的生产地层,并具有电容性,在此间隔内进行HF,通过抽水产生压裂用作胶凝酸的胶凝液体,并在HF末端用支撑剂固定裂缝,将管柱移至下一个层段,其对应于基础生产地层的过滤能力低,并进行HF裂缝的形成和支撑剂裂缝的附接,同样将管柱移动到井底,在剩余的层段中对相应的较低产层进行HF过滤能力低,随后每次进行间隔HF,通过减少注入的胶凝酸和缩锥的体积来减少形成的裂缝的长度在HF的每个间隔中注入支撑剂以固定形成的裂缝,并使用40/70筛孔的支撑剂,完成HF之后,将一个球滴入油管柱中,油管柱中的压力足以断开旁通阀的剪切螺栓,同时安全阀套筒向下移动并从内部密封喷嘴的喷嘴,将技术封隔器种植在井的套管部分中,并在液位降低的情况下进行开发到1,000 m,并从井眼向斜道槽中泵入25 m 3 的液体,并在pH值下取样,如果pH值小于4,则继续将其泵送到pH值超过4个,每10 m 3 抽出的液体进行采样,然后停止井的开发,拆开过程封隔器的包装,并从井中拆下管柱和组件。;效果:技术成果是在多层扫描仪中提高该方法的效率带足底水的水库。; 1 cl,3 dwg

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号