首页>
外国专利>
The base and a method for setting up of this base
The base and a method for setting up of this base
展开▼
机译:基地和建立基地的方法
展开▼
页面导航
摘要
著录项
相似文献
摘要
The present invention relates to a base with two mutually opposite first side walls, and two connecting the first side walls, which are mutually opposite, second side walls, wherein the first and the second side walls each have side under edges, on the height of a base bottom surface of the base, the first and second side walls have edges in each case, the side surface, on the height of a base support surface of the base extends, in a between the first and second side walls of a base formed on the inside space at least two, groove lines, which are derived from the base bottom surface to the base support surface extending stand elements are provided, which stand elements in each case a first connection fold section of the flat with one of the first side walls is connected, and at least starting from the sides or edges of the first side walls base cover sections, project into the base support surface. The present invention further relates to a method for setting up of such a base. In order to provide a base, which is constructed to be particularly dimensionally stable, a high load capacity and a functional bearing surface and can be produced at low cost, according to the invention, a base of the above mentioned type is proposed, in which the stand elements in each case a second connection fold portion, the flat with an underside of in each case one of the base is connected to the cover sections. For a simple setting up of such a base, it is further proposed by central folding of the second side walls, which is formed on side wall halves of the crease line between the side wall halves in the direction of the base center to compress and / or by the first side walls of the base center to be pulled outward, until the second side walls straight surfaces form, wherein the stand elements, each of which has a second connection fold portion, the flat with an underside of in each case one of the base cover sections is connected, by means of a movement and / or folding of the base cover portions of the first side walls in the direction of the base support surface with the formation of right angles between the first connection fold portion and a to the first connection fold section adjoining first connecting web of the respective upright element, between the first connecting web and a to the first connecting web adjoining second connecting web of the respective upright element, between the second connecting web and the to the second connecting web adjoining second connection fold portion of the respective upright element be unfolded.n="46"
展开▼