首页> 外国专利> METHOD AND SYSTEM FOR ESTABLISHING WELL PERFORMANCE DURING PLUG MILL-OUT OR CLEANOUT/WORKOVER OPERATIONS

METHOD AND SYSTEM FOR ESTABLISHING WELL PERFORMANCE DURING PLUG MILL-OUT OR CLEANOUT/WORKOVER OPERATIONS

机译:在塞子磨出或清理/修整操作期间建立油井性能的方法和系统

摘要

A method and system is provided that analyzes flow characteristics of return fluid that flows to a surface-located facility during well operations (such as plug mill-out or cleanout/workover operations) in order to characterize local formation properties of the formation. The method and system can be used to characterize a hydraulically-fractured hydrocarbon-bearing formation that is traversed by a well having a number of intervals that are hydraulically isolated from one another by corresponding plugs.
机译:提供了一种方法和系统,该方法和系统分析在井作业(例如,旋塞铣削或清理/修井作业)期间流向地表设施的回流流体的流动特性,以便表征地层的局部地层特性。该方法和系统可用于表征由具有一定间隔的井横穿的水力压裂的含烃地层,这些井通过相应的塞子彼此液压隔离。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号