WORK SCHEDULE CALCULATING PROGRAM, WORK SCHEDULE CALCULATING METHOD AND INFORMATION PROCESSING DEVICE
WORK SCHEDULE CALCULATING PROGRAM, WORK SCHEDULE CALCULATING METHOD AND INFORMATION PROCESSING DEVICE
展开▼
机译:作业时间表计算程序,作业时间表计算方法和信息处理装置
展开▼
页面导航
摘要
著录项
相似文献
摘要
PROBLEM TO BE SOLVED: To facilitate a manager to grasp a work schedule.;SOLUTION: A processing unit 12 acquires, from a storing unit 11, task information 11a that contains a scheduled start date of each task not completed yet and a scheduled end date thereof, and progress information 11b that contains the progress rate of each task for each progress report day, calculates an average value or a latest value of an increase level of the progress rate of a task 15 not completed yet on the basis of the progress information 11b, calculates a delay quantity d1 indicating a delay from the scheduled end date (day D2) of the task 15 on the basis of the average value or the latest value, detects a task 16 which is not completed yet, is scheduled to be executed next to the task 15, and has an overlap work time period with the task 15 due to the delay quantity d1 on the basis of the task information 11a and the delay quantity d1, multiples the delay quantity d1 by a first value (2 in the example in FIG. 1) and calculates a delay quantity (d1×2 in the example in FIG. 1) which includes an adverse effect of overlap work time period and which indicates a delay from the respective scheduled end dates (days D2 and D3) of the task 15 and task 16.;SELECTED DRAWING: Figure 1;COPYRIGHT: (C)2019,JPO&INPIT
展开▼