首页> 外国专利> Elevator long object carrying jig, elevator guide rail removal method and elevator guide rail installation method

Elevator long object carrying jig, elevator guide rail removal method and elevator guide rail installation method

机译:电梯长物搬运夹具,电梯导轨的拆卸方法及电梯导轨的安装方法

摘要

Provided is a long object carrying jig for an elevator that can shorten the time required for carrying a long object in a hoistway. The elevator long object carrying jig (1) according to the present invention is formed shorter than the interval between the counterweight guide rails (15) installed in the hoistway (16), and is in a standing state. The bottom beam (2) on which the long object (25) can be placed, the first standing column (3) whose lower end is connected to one end of the bottom beam (2), and the lower end is the bottom beam (2) The second vertical column (4) connected to the other end of the beam and facing the first vertical column (3) in the longitudinal direction of the bottom beam (2), and protruding outward from the first vertical column (3), one balance A first guide shoe mounting member (10) to which a guide shoe (14) moving along the weight guide rail (15) is mounted, and the other counterweight weight guide projecting outward from the second standing column (4). A second guide shoe remover to which a guide shoe (14) moving along the rail (15) is attached It comprises a member (11), the.
机译:提供一种用于电梯的长物体搬运夹具,其可以缩短在井道中搬运长物体所需的时间。本发明的电梯用长物搬运夹具(1)形成为比设置在井道(16)上的对重导轨(15)之间的间隔短,处于立起状态。可以放置长物体(25)的底梁(2),第一直立柱(3),其下端连接到底梁(2)的一端,而下端是底梁( 2)第二垂直柱(4),其连接至梁的另一端并在底部梁(2)的纵向上面向第一垂直柱(3),并从第一垂直柱(3)向外突出,一个天平安装有一个第一导靴安装构件(10),一个沿配重导轨(15)移动的导靴(14)安装在其中,另一个配重配重导轨从第二立柱(4)向外突出。沿导轨(15)移动的导向靴(14)安装在其上的第二导向靴拆卸器,其包括构件(11)。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号