首页> 外国专利> TUNNEL CONSTRUCTION METHOD AND DISPLACEMENT MEASURING DEVICE

TUNNEL CONSTRUCTION METHOD AND DISPLACEMENT MEASURING DEVICE

机译:隧道施工方法及位移量测装置

摘要

PROBLEM TO BE SOLVED: To provide a tunnel construction method which can construct a tunnel at high quality by properly grasping the displacement of a rock mass, and a displacement measuring device.SOLUTION: A tunnel construction method comprises: an upper-half excavation process for excavating a tunnel upper half 11; a measuring device installation process for installing a displacement measuring device 6 at a bottom of a tunnel 1 from the tunnel upper half 11; a lower half excavation process for excavating a tunnel lower half 12 while confirming rock mass displacement by the displacement measuring device 6; an invert excavation process for excavating an invert part 13 while confirming the rock mass displacement by the displacement measuring device 6; and an invert placing process for placing invert concrete into the invert part 13.SELECTED DRAWING: Figure 2
机译:解决的问题:提供一种能够通过适当地掌握岩体的位移来高质量地建造隧道的隧道施工方法和位移测量装置。解决方案:隧道施工方法包括:隧道的上半部开挖过程。挖掘隧道上半部11;测量装置安装过程,用于从隧道上半部11在隧道1的底部安装位移测量装置6;下半部挖掘工序,用于在利用位移测量装置6确认岩体位移的同时挖掘隧道下半部12。反转挖掘工序,用于在利用位移测量装置6确认岩体位移的同时挖掘反转部13。以及将混凝土倒置到倒置部件中的倒置过程13.选择的图纸:图2

著录项

  • 公开/公告号JP6441102B2

    专利类型

  • 公开/公告日2018-12-19

    原文格式PDF

  • 申请/专利权人 大成建設株式会社;

    申请/专利号JP20150020539

  • 发明设计人 鈴木 伸;沢藤 尚文;柴田 勝実;

    申请日2015-02-04

  • 分类号E21D9;G01C7/06;G01C15;

  • 国家 JP

  • 入库时间 2022-08-21 12:17:55

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号