首页> 外国专利> Method of introducing pre-stress to cast-in-place concrete

Method of introducing pre-stress to cast-in-place concrete

机译:在现浇混凝土中引入预应力的方法

摘要

PROBLEM TO BE SOLVED: To install a precast concrete member having a tension material arranged therein with the end section protruded from an end surface between adjacent support members, and thereafter to introduce a pre-stress to junction concrete placed on a job site on the support members by using the tension material buried in the junction concrete.SOLUTION: An end surface side edge part 32 of a tension material 3 protruded from an end surface in an axial direction of a pre-cast concrete member 1 is fixed to a fixing plate 5 or a fixed material 6 of the pre-cast concrete member 1 by using a fixture 7 in a state that a tensile force is applied to the tension material 3, and the movement of the fixture 7 to the fixing plate 5 side is constrained by using the fixed material 6, and after junction concrete 4 reveals strength, the constraint of the fixture 7 by the fixed material 6 is released to generate the movement of the fixture 7 to the fixing plate 5 side, and a pre-stress is introduced to the junction concrete 4.SELECTED DRAWING: Figure 1
机译:解决的问题:安装其中布置有抗拉材料的预制混凝土构件,其端部从相邻支撑构件之间的端面突出,然后引入预应力以接合放置在支撑工作现场的混凝土。解决方案:从预制混凝土构件1的轴向端面突出的拉伸材料3的端面侧边缘部分32固定在固定板5上。或通过使用固定装置7将预制混凝土构件1的固定材料6固定在向张力材料3施加拉力的状态下,并且通过使用固定装置6限制固定装置7向固定板5侧的移动。固定材料6,并在接合混凝土4显现出强度后,释放固定材料6对固定装置7的约束,从而使固定装置7朝固定板5侧移动,并施加预应力产生到结混凝土4.选择的图纸:图1

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号