首页> 外国专利> Power network reduction and simulation in time and frequency domains to calculate voltage drop

Power network reduction and simulation in time and frequency domains to calculate voltage drop

机译:在时域和频域中进行电网缩减和仿真以计算电压降

摘要

In the present invention the issue of calculating voltage drop at the contact points of the power network with injected power currents is proposed. The method consists of the three steps. First, the said power network is partitioned into sub-networks. Secondly, the said sub-networks are expressed in terms of their admittance matrices and voltage transfer functions, which are then fed into timing simulator handling both time and frequency to compute the voltage drop at the said contact points. To achieve better partition result, inputs, outputs including user assigned nodes for recording voltages, are utilized to absorb the sub-network without inputs and outputs into the same partition as its parent node, and generate output cone with single input and outputs. Timing simulator uses convolution to get input voltage at each time step recursively and then voltage transfer used to evaluate output voltage at the same time step with minimal computational overhead.
机译:在本发明中,提出了计算在具有注入的功率电流的电网的接触点处的电压降的问题。该方法包括三个步骤。首先,将所述电力网络划分为子网络。其次,所述子网络以其导纳矩阵和电压传递函数表示,然后将其馈入处理时间和频率的时序模拟器中,以计算所述接触点处的电压降。为了获得更好的分区效果,输入,输出(包括用于记录电压的用户分配节点)用于吸收没有输入和输出的子网,并将其输出到与其父节点相同的分区中,并生成具有单个输入和输出的输出圆锥。时序模拟器使用卷积递归地获取每个时间步长的输入电压,然后使用电压传递以最小的计算开销来评估同一时间步长的输出电压。

著录项

  • 公开/公告号US10325047B2

    专利类型

  • 公开/公告日2019-06-18

    原文格式PDF

  • 申请/专利权人 MAU-CHUNG CHANG;

    申请/专利号US201514872153

  • 发明设计人 MAU-CHUNG CHANG;

    申请日2015-10-01

  • 分类号G06F17/50;

  • 国家 US

  • 入库时间 2022-08-21 12:16:22

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号