首页> 外国专利> Fast model generating and solving method for security-constrained power system operation simulation

Fast model generating and solving method for security-constrained power system operation simulation

机译:安全受限的电力系统运行仿真的快速模型生成与求解方法

摘要

The present disclosure provides a fast model generating and solving method for security-constrained power system operation simulation, which includes: obtaining information of all branches and nodes which are involved during operation simulation time period, calculating original-node impedance matrix, load shifting distribution factor original matrix and generator shifting distribution factor original matrix of all involved branches; correcting the load shifting distribution factor original matrix and the generator shifting distribution factor original matrix according to the on-off state of branches; obtaining output of each generator unit at each time period according to no-security-constraint unit commitment model, and determining overload of each branch again; solving iteratively until no branch is overloaded, and obtaining output of each generator unit at each time period under security constraint of operation simulation for the current simulation day, performing operating simulation for the rest simulation days to obtain security-constraint operation simulation result for the whole year.
机译:本公开提供了一种用于安全受限的电力系统运行仿真的快速模型生成和求解方法,包括:获取运行仿真时间段内涉及的所有分支和节点的信息,计算原始节点阻抗矩阵,负荷转移分布因子所有相关分支的原始矩阵和生成器移位分布因子原始矩阵;根据分支机构的通断状态,对负荷转移分配因子原始矩阵和发电机转移分配因子原始矩阵进行校正。根据无安全约束单元承诺模型,在每个时间段获取每个发电机单元的输出,并再次确定每个分支的过载;迭代求解直到没有分支过载,并在当前模拟日的运行模拟安全约束下在每个时间段获取每个发电机组的输出,在其余模拟日进行运行模拟,以获得整个系统的安全约束运行模拟结果年。

著录项

  • 公开/公告号US10289765B2

    专利类型

  • 公开/公告日2019-05-14

    原文格式PDF

  • 申请/专利权人 TSINGHUA UNIVERSITY;

    申请/专利号US201615248019

  • 申请日2016-08-26

  • 分类号G06F17/16;G06F17/50;G06F17/11;

  • 国家 US

  • 入库时间 2022-08-21 12:15:47

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号