Systems and methods are described for robust scheduling of beam switching patterns in satellite communications systems. Embodiments operate in context of a hub-spoke satellite communications architecture having a number of gateway terminals servicing large numbers of user terminals over a number of spot beams. The satellite includes switching subsystems that distribute capacity to the user beams from multiple of the gateway terminals in a shared manner according to a beam group switching pattern. The beam group switching pattern is robustly formulated to continue distributing capacity during gateway outages (e.g., when one or two gateway terminals are temporarily non-operational due to rain fade, equipment failure, etc.). For example, the beam group switching pattern can be formulated to minimize worst-case degradation of capacity across user beams, to prioritize certain beams or beam groups, etc.
展开▼