首页>
外国专利>
INSTALLATION PROCESS OF A HYBRID TOWER IN A WATER EXTENSION, HYBRID TOWER AND INSTALLATION OF FLUID EXPLORATION IN A WATER EXTENSION
INSTALLATION PROCESS OF A HYBRID TOWER IN A WATER EXTENSION, HYBRID TOWER AND INSTALLATION OF FLUID EXPLORATION IN A WATER EXTENSION
展开▼
机译:混水塔在加水塔中的安装过程,混水塔和扩水中的流体勘探的安装
展开▼
页面导航
摘要
著录项
相似文献
摘要
The process of installing a hybrid tower in a water extension, hybrid tower and installing a fluid exploration in a water extension process comprises the arrangement of a rising column (22) in a vertical configuration and the total immersion of a float. retention of the rising column (22). comprises inserting a float-supported connecting element (62) into a connecting female element (64) supported by the rising column (22) and securing the connecting male element (62) in a receiving passage (92) defined by the connecting female element (64). the female connecting element (64) comprises at least one guide surface (98) of the male connecting element (62) in the direction of the receiving passage (92). the insertion step comprising orienting the connecting male element (62) towards the receiving passage (92) by contacting a guide surface (98) of the connecting female element (64) having a diverging vertical section away from it. from the receiving passage (92) towards the connecting male element (62).
展开▼