首页> 外国专利> METHOD OF OPTIMIZING OPERATION ONE OR MORE TUBING STRINGS IN A HYDROCARBON WELL, APPARATUS AND SYSTEM FOR SAME

METHOD OF OPTIMIZING OPERATION ONE OR MORE TUBING STRINGS IN A HYDROCARBON WELL, APPARATUS AND SYSTEM FOR SAME

机译:在油气井中优化一个或多个管道的操作方法,装置和系统

摘要

A method of optimizing operation one or more tubing strings in a hydrocarbon well, apparatus and system for same. Each tubing string is located in a hydrocarbon well and has a plurality of valves. Each valve is actuatable between a fully open position and a fully closed position, and is in communication with a respective zone of a formation defining a reservoir containing hydrocarbon material. The method comprises: characterizing an injectivity of one or more zones of the formation in accordance with pressure data associated with each of the one or more zones of the formation; and determining an optimal operating schedule in accordance with the characterization of the one or more zones of the formation and one or more performance objectives, wherein the optimal operating schedule comprises one or more valve configurations and an operating duration for each of the one or more valve configurations, wherein each valve configuration is defined by a condition of the valves in which each valve in the plurality of valves is in either the fully open position or the fully closed position.
机译:一种优化操作烃井中的一个或多个油管柱的方法,装置和系统。每个油管柱位于烃井中并具有多个阀。每个阀可在完全打开位置和完全关闭位置之间致动,并且与限定包含烃材料的储层的地层的相应区域连通。该方法包括:根据与地层的一个或多个区域中的每一个相关联的压力数据来表征地层的一个或多个区域的注入性;以及根据地层的一个或多个区域的特征和一个或多个性能目标确定最佳运行时间表,其中,最佳运行时间表包括一个或多个阀门配置以及一个或多个阀门中每个阀门的运行持续时间构型,其中每个阀构型由多个阀中的每个阀处于完全打开位置或完全关闭位置的阀的状态限定。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号