首页> 外国专利> Cascaded model predictive control (MPC) approach for plantwide control and optimization

Cascaded model predictive control (MPC) approach for plantwide control and optimization

机译:级联模型预测控制(MPC)方法用于整个工厂的控制和优化

摘要

#$%^&*AU2019232889A120191010.pdf#####C:Interwo nNRPortblDCCDXL19330145_l.docx-19/09/2019 ABSTRACT A method comprising: obtaining a planning model for an industrial facility at a master model predictive 5 control (MPC) controller; sending at least one optimization call from the master MPC controller to one or more slave MPC controllers; receiving at least one proxy limit value from the one or more slave MPC controllers at the master MPC controller in response to the at least one optimization call, wherein the at least 10 one proxy limit value identifies to what extent one or more process variables controlled by the one or more slave MPC controllers are adjustable without violating any process variable constraints; and performing plantwide optimization at the master MPC controller using the planning model and the at least one proxy limit value, wherein the at least one proxy limit value allows 15 the master MPC controller to honor the process variable constraints of the one or more slave MPC controllers during the plantwide optimization.1/16 ENTERPRISE OPERATOR 100 CONTROLLER STATION 138 142 144 148 150 140 HISTORIAN 141 146 152 136 134 130 132 PLANT 000 L PLANTS 1 I1 I ROUTER/ PLANT OPERATOR I 101b 101n I FIREWALL CONTROLLER STATION I I I' I 126 122 124 S128 I ROUTER/ UNIT OPERATOR I I FIREWALL CONTROLLER STATION I I I 1118 114 120 116 1 101 a I ROUTER/ MACHINE OPERATOR I I FIREWALL CONTROLLER STATION I I 1 112 SWITCH/ FIREWALL 110 I I 104 108 CONTROLLER 106 I I SENSOR 102a 102b ACTUATOR I L- ---------------------i FIG.1I
机译:#$%^&* AU2019232889A120191010.pdf #####C: Interwo n NRPortbl DCC DXL 19330145_l.docx-19 / 09/2019抽象一种方法,包括:在主模型预测下获得工业设施的规划模型5控制(MPC)控制器;从主MPC控制器发送至少一个优化调用到一个或多个从属MPC控制器;在以下位置从一个或多个从属MPC控制器接收至少一个代理限制值:所述主MPC控制器响应于所述至少一个优化调用,其中,所述至少10一个代理极限值确定一个或多个过程变量在多大程度上受控制一个或多个从MPC控制器是可调的,而不会违反任何过程变量约束和使用计划在主MPC控制器上执行全厂范围的优化模型和至少一个代理极限值,其中至少一个代理极限值允许15主MPC控制器遵守一个或多个从机的过程变量约束全厂优化期间的MPC控制器。1/16企业经营者100个控制站138142144148150140历史141146152136134130132植物000升植物1个I1I路由器/工厂运营商I 101b 101nI防火墙控制器I我我126122124S128路由器/单元操作员II防火墙控制器I我我1118 114 120 116 1101个路由器/机器操作员II防火墙控制器I我1112开关/防火墙110我我104108控制器106我我传感器102a 102b执行器IL- --------------------- i图1I

著录项

  • 公开/公告号AU2019232889A1

    专利类型

  • 公开/公告日2019-10-10

    原文格式PDF

  • 申请/专利权人 HONEYWELL INTERNATIONAL INC.;

    申请/专利号AU20190232889

  • 发明设计人 LU JOSEPH Z.;

    申请日2019-09-19

  • 分类号G05B19/418;

  • 国家 AU

  • 入库时间 2022-08-21 11:55:18

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号