首页> 外国专利> MULTI-SECTION STAGED PRESSURE-REDUCTION WATER INJECTION APPARATUS BASED ON FRACTURE OBSERVATION AND OBSERVATION METHOD THEREOF

MULTI-SECTION STAGED PRESSURE-REDUCTION WATER INJECTION APPARATUS BASED ON FRACTURE OBSERVATION AND OBSERVATION METHOD THEREOF

机译:基于断裂观测的分段多级减压注水装置及其观测方法

摘要

A multi-section staged pressure-reduction water injection apparatus based on fracture observation and an observation method thereof. The apparatus comprises a testing probe, a propulsion system, and a control system, the testing probe comprising plugging devices, a partial pressure assembly (49), and a connecting pipe (28), a water injection cavity being formed between the plugging devices and the borehole, the partial pressure assembly (49) being mounted at the tail end of a front part plugging device (35) and a middle part plugging device (36), and being formed of a primary converter (6) and a secondary converter (39) for converting in stages the high-pressure water source in the connecting pipe (28) into a low-pressure water source to flow into the water injection cavity for detection; the plugging device comprises a water leakage pipe (3), a rubber bladder (5), and a joint, the rubber bladder (5) being wrapped around the outside of the water leakage pipe (3) and being fixed at two ends of the joint by means of a fastening ring (24), forming a plugging cavity (30) with the water leakage pipe (3). The present apparatus uses the same external water source to implement a plugging process and a detection process and operate under the respective pressures thereof, stabilises pressure conversion, and integrates plugging and side leakage systems, solving the problem of the winding of the drill rod and hose during the propulsion process, and also implementing multi-section measurement for each propulsion and improving measurement efficiency.
机译:基于断裂观察的多段式减压注水装置及其观察方法。该设备包括测试探针,推进系统和控制系统,该测试探针包括堵塞装置,分压组件(49)和连接管(28),在堵塞装置之间形成注水腔。在井眼中,分压组件(49)安装在前部堵塞装置(35)和中部堵塞装置(36)的后端,并且由一次转换器(6)和二次转换器( 39)用于将连接管28内的高压水源分阶段转换为低压水源,流入注水腔进行检测;所述堵塞装置包括漏水管(3),橡胶囊(5)和接头,所述橡胶囊(5)包裹在所述漏水管(3)的外侧,并固定在所述漏斗的两端。通过紧固环(24)连接,与漏水管(3)形成堵塞腔(30)。本设备使用相同的外部水源来执行堵塞过程和检测过程,并在其各自的压力下操作,稳定压力转换,并整合堵塞和侧漏系统,解决了钻杆和软管缠绕的问题在推进过程中,还对每个推进进行多部分测量,提高了测量效率。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号