首页> 外国专利> METHOD AND DEVICE FOR CONTROL OF COAL BED UPPER PART COLLAPSE AREA DUE TO APPLICATION OF TECHNOLOGY OF PULSED HYDRAULIC FRACTURING OF A FORMATION

METHOD AND DEVICE FOR CONTROL OF COAL BED UPPER PART COLLAPSE AREA DUE TO APPLICATION OF TECHNOLOGY OF PULSED HYDRAULIC FRACTURING OF A FORMATION

机译:由于地层脉冲水力压裂技术的应用,控制煤层上部塌陷区的方法和装置

摘要

FIELD: mining.;SUBSTANCE: invention relates to a method of controlling a section of a coal bed upper part collapse, in particular to a method and apparatus for controlling a collapsing area of an upper portion of a coal bed by applying a technology of pulsed hydraulic fracturing of a formation, which relate to the field of coal production technology application. Device in the present invention consists of a pulse pump with low feed and a common pump with high feed, which are controlled by means of a three-pass hydraulic distributor and a switching valve. First, a pump pulse path is connected in the structure, the pipeline of a high-pressure conventional pump is closed, the pulse channel closes after the end of the pulse fracture and an ordinary fracture channel opens. Method combines advantages of using methods of pulse and traditional hydraulic fracturing. First, formation of a network of cracks takes place in an array of coal by means of pulsed hydraulic fracturing of the formation. Further, using the method of traditional hydraulic fracturing of the high-movement formation, network of cracks continues to expand, structure of coal massif is sufficiently transformed, fragmentation of upper part of coal bed is reduced, and ability to collapse of this part of coal bed is increased.;EFFECT: using this method and device, in the upper part of the coal bed there can be formed a sufficient number of cracks, the upper part of the coal bed can be weakened, and also the ability to collapse the upper part of the coal bed and its crushing, design is convenient, adequate level of safety and reliability is achieved, and unproductive use of resources can be reduced.;9 cl, 7 dwg
机译:控制煤层上部塌陷断面的方法及装置技术领域本发明涉及一种控制煤层上部塌陷断面的方法,尤其涉及一种采用脉冲技术控制煤层上部塌陷面积的方法及装置。地层的水力压裂,涉及煤炭生产技术领域的应用。本发明中的装置由低进给量的脉冲泵和高进给量的普通泵组成,它们由三通液压分配器和切换阀控制。首先,在该结构中连接泵脉冲路径,关闭高压常规泵的管道,在脉冲断裂结束后关闭脉冲通道,并打开一条普通的断裂通道。该方法结合了脉冲法和传统水力压裂法的优点。首先,借助于地层的脉冲水力压裂,在一组煤中形成裂缝网络。此外,采用传统的高活动地层水力压裂方法,裂缝网络不断扩大,煤块结构得到充分转变,煤层上部碎裂减少,这部分煤塌陷的能力效果:使用这种方法和装置,在煤层的上部可以形成足够数量的裂缝,可以削弱煤层的上部,并且还可以塌陷煤层部分煤层及其破碎,设计方便,达到足够的安全性和可靠性,并可以减少资源的非生产性使用。; 9 cl,7 dwg

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号