首页> 外国专利> How to relocate the derrick mast guide device for steel tower assembly and dismantling work and the mast guide device

How to relocate the derrick mast guide device for steel tower assembly and dismantling work and the mast guide device

机译:如何重新定位用于钢塔装配和拆卸工作的井架桅杆导向装置以及桅杆导向装置

摘要

PROBLEM TO BE SOLVED: To provide a mast guide device capable of omitting lifting and lowering work in which an operator moves back and forth between a steel tower and a mast at the time of assembling a steel tower. SOLUTION: A mast guide device 7 surrounds a mast 3 so as to be able to move up and down relative to each other, is supported by a steel tower main pillar member P by a horizontal branch line 9, and holds the mast 3 perpendicularly to the steel tower T. It includes an annular frame 14 that surrounds the mast 3 so as to be able to move up and down relative to each other, a guide roller 15 provided on the annular frame 14, and a stopper 16. The guide roller 15 can roll up and down on the outside of the mast main pillar members 3a to 3d. The stopper 16 can freely restrain and release the mast main pillar members 3a to 3d, and is urged to the restrained position by the spring 17. When one end side of the horizontal branch line 9 is connected to the stopper 16 and the other end side is locked to the tower main column member P with a predetermined tension, the stopper 16 is arranged at the release position against the urging force of the spring 17. To do. [Selection diagram] FIG. 7
机译:解决的问题:提供一种桅杆引导装置,该桅杆引导装置能够省略在组装钢塔时操作员在钢塔和桅杆之间来回移动的升降工作。解决方案:桅杆导向装置7围绕桅杆3以便能够相对于彼此上下移动,并由钢塔主支柱构件P通过水平分支线9支撑,并且将桅杆3垂直于包括围绕桅杆3以便能够相对于彼此上下移动的环形框架14,设置在环形框架14上的导向辊15和止动件16。图15所示的结构可以在桅杆主立柱构件3a至3d的外侧上上下滚动。止动件16能够自由地限制和释放桅杆主柱构件3a至3d,并且被弹簧17推动到限制位置。当水平分支线9的一端侧连接到止动件16和另一端侧时。弹簧16以预定的张力锁定在塔架主柱构件P上,在弹簧17的弹力的作用下,将释放器16配置在释放位置。 [选择图] 7

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号