首页> 外国专利> Construction method of excavated blade-mounted steel pipe and cast-in-place concrete pile for construction of cast-in-place concrete pile

Construction method of excavated blade-mounted steel pipe and cast-in-place concrete pile for construction of cast-in-place concrete pile

机译:用于开挖现浇混凝土桩的开挖刀片式钢管和现浇混凝土桩的施工方法

摘要

PROBLEM TO BE SOLVED: To provide an excavation blade fitting steel pipe for constructing a cast-in-place concrete-based pile that enables a concrete-based pile for ground reinforcement of a stable equality to be constructed without being affected by a soil condition at a site, at the same time enabling the concrete-based pile to be constructed readily and reliably at the site.SOLUTION: An excavation blade fitting steel pipe 1 comprises a steel pipe 10, and a tip excavation blade 20 fitted detachably at a tip of the steel pipe and having an excavation blade body 22 on a tip surface. A protrusion 13 is provided on an inner peripheral surface at the tip of the steel pipe 10, while a rotation receiving part 23a is provided on the tip excavation blade 20 for having the tip excavation blade 20 rotate integrally with the steel pipe 10 by bringing the steel pipe 10 in contact with the protrusion 13 when the steel pipe rotates in a prescribed direction of rotation. The rotation receiving part 23a is separated from the inner peripheral surface of the steel pipe 10 toward a center of the steel pipe.SELECTED DRAWING: Figure 5
机译:要解决的问题:提供一种用于建造现浇混凝土基桩的挖掘刀片装配钢管,该钢管能够在不受到土壤条件影响的情况下构造出稳定稳定的地基混凝土基桩。解决方案:装有挖掘机铲刀的钢管1包括钢管10和可拆卸地安装在水泥铲斗的顶端的前端挖掘铲刀20。该钢管在前端面上具有挖掘刃主体22。在钢管10的前端的内周面设有突起13,在前端挖掘刃20上设有旋转承受部23a,通过使前端挖掘刃20与钢管10一体旋转,从而具有旋转接受部23a。当钢管沿规定的旋转方向旋转时,钢管10与突起13接触。旋转承受部23a从钢管10的内周面朝向钢管的中心离开。选图:图5

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号