首页>
外国专利>
Group management elevator operation control method and group management control device
Group management elevator operation control method and group management control device
展开▼
机译:群组管理电梯的运行控制方法及群组管理控制装置
展开▼
页面导航
摘要
著录项
相似文献
摘要
PROBLEM TO BE SOLVED: To prevent at least one elevator from operating immediately after a building shake is converged so as to prevent inconvenience such as long service stoppage. SOLUTION: A first distributed standby zone and a second distributed standby zone are defined as distributed standby zones in which the elevator cars that have completed a call response are distributed standby. When the building shake is detected and it is predicted that the shake amount of at least one elevator long object may reach the upper limit level, the distributed standby zone is changed from the first distributed standby zone to the second distributed standby zone. And the car waiting in the first distributed standby zone is moved to the second distributed standby zone. Among the second distributed standby zones, the elevators whose cars have moved to the priority standby zone, which is the zone where long objects are most unlikely to resonate with building vibration, are not assigned to the elevators Wait in the priority waiting zone until the shaking converges. [Selection diagram] FIG.
展开▼