首页> 外国专利> Group management elevator operation control method and group management control device

Group management elevator operation control method and group management control device

机译:群组管理电梯的运行控制方法及群组管理控制装置

摘要

PROBLEM TO BE SOLVED: To prevent at least one elevator from operating immediately after a building shake is converged so as to prevent inconvenience such as long service stoppage. SOLUTION: A first distributed standby zone and a second distributed standby zone are defined as distributed standby zones in which the elevator cars that have completed a call response are distributed standby. When the building shake is detected and it is predicted that the shake amount of at least one elevator long object may reach the upper limit level, the distributed standby zone is changed from the first distributed standby zone to the second distributed standby zone. And the car waiting in the first distributed standby zone is moved to the second distributed standby zone. Among the second distributed standby zones, the elevators whose cars have moved to the priority standby zone, which is the zone where long objects are most unlikely to resonate with building vibration, are not assigned to the elevators Wait in the priority waiting zone until the shaking converges. [Selection diagram] FIG.
机译:要解决的问题:为了防止建筑物震动收敛后至少一台电梯立即运行,以防止诸如长期服务中断之类的麻烦。解决方案:第一分布式备用区和第二分布式备用区被定义为分布式备用区,在其中,已完成呼叫响应的电梯轿厢为分布式备用区。当检测到建筑物震动并且预测至少一个电梯长物体的震动量可以达到上限水平时,分布式待机区域从第一分布式待机区域改变为第二分布式待机区域。并且在第一分布式待机区域中等待的轿厢被移动到第二分布式待机区域。在第二个分布式待机区域中,其轿厢已移动到优先待机区域的电梯(该区域是长物体最不可能与建筑物振动产生共鸣的区域)没有分配给这些电梯,而是在优先等待区域中等待直到振动收敛。 [选择图]

著录项

  • 公开/公告号JP6657368B1

    专利类型

  • 公开/公告日2020-03-04

    原文格式PDF

  • 申请/专利权人 東芝エレベータ株式会社;

    申请/专利号JP20180229989

  • 发明设计人 小坂井 啓一;

    申请日2018-12-07

  • 分类号B66B5/02;B66B1/18;

  • 国家 JP

  • 入库时间 2022-08-21 11:32:09

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号