首页> 外国专利> Drilling engineering analysis roadmap builder for hydrocarbon reservoir modeling

Drilling engineering analysis roadmap builder for hydrocarbon reservoir modeling

机译:油气藏建模的钻井工程分析路线图生成器

摘要

Methods, systems, and computer program products for developing and presenting wellbore pipe string related operation engineering parameter roadmaps in hydrocarbon reservoir modeling are disclosed. A computer-implemented method may include receiving a plurality of depth intervals, associating different computational model calculations with each depth interval, selecting input parameter values for each set of computational model calculations, generating computational model results for each set of computational model calculations associated with each interval to yield a graphical interval plot for the depth interval; and displaying a plurality of graphical interval plots together on a wellbore roadmap. A control list for the roadmap is correspondingly generated and dynamically linked to the wellbore roadmap so that individual entries in the control list are associated with individual interval plots.
机译:公开了用于在油气藏建模中开发和呈现与井筒管柱相关的操作工程参数路线图的方法,系统和计算机程序产品。一种计算机实现的方法可以包括:接收多个深度间隔;将不同的计算模型计算与每个深度间隔相关联;为每组计算模型计算选择输入参数值;为与每一个相关联的每组计算模型计算生成计算模型结果。间隔以生成深度间隔的图形间隔图;在井眼路线图上一起显示多个图形间隔图。相应地生成路线图的控制列表并将其动态链接到井眼路线图,以便控制列表中的各个条目与各个间隔图相关联。

著录项

  • 公开/公告号US10597981B2

    专利类型

  • 公开/公告日2020-03-24

    原文格式PDF

  • 申请/专利权人 LANDMARK GRAPHICS CORPORATION;

    申请/专利号US201315025861

  • 发明设计人 GUSTAVO A. URDANETA;

    申请日2013-10-25

  • 分类号E21B41;E21B7;G06F17/10;G01V1/40;

  • 国家 US

  • 入库时间 2022-08-21 11:29:52

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号