首页> 外国专利> Removing submerged piles of offshore production platforms

Removing submerged piles of offshore production platforms

机译:拆除沉没的海上生产平台桩

摘要

Certain aspects of removing submerged piles of offshore production platforms can be implemented as methods. A top deck of a fixed offshore platform installed on a mudline of a body of water is removed. An upper structure of the fixed offshore platform is removed. The upper structure is below the top deck. A lower structure is secured to the mudline by one or more structural piles remaining. The one or more structural piles, which are housed within one or more members of the lower structure, are driven below the mudline. The lower structure of the fixe offshore platform is removed. The one or more structural piles are left below the mudline.
机译:移除海上生产平台的淹没桩的某些方面可以实现为方法。拆除安装在水体泥线上的固定海上平台的顶层甲板。固定式海上平台的上部结构被拆除。上部结构在顶层甲板下方。剩下的一个或多个结构桩将下部结构固定在泥线上。容纳在下部结构的一个或多个构件内的一个或多个结构桩被打入泥线以下。固定式海上平台的下部结构被拆除。一个或多个结构桩留在泥线以下。

著录项

  • 公开/公告号US10633817B2

    专利类型

  • 公开/公告日2020-04-28

    原文格式PDF

  • 申请/专利权人 SAUDI ARABIAN OIL COMPANY;

    申请/专利号US201916448984

  • 发明设计人 PRAKASHA SUBRAMANYAM KUPPALLI;

    申请日2019-06-21

  • 分类号E02D9;E02D7/06;E02D13;E02D7/28;E02B17;

  • 国家 US

  • 入库时间 2022-08-21 11:28:41

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号