首页> 外国专利> Daily electricity generation plan making method of cascade hydraulic power plant group

Daily electricity generation plan making method of cascade hydraulic power plant group

机译:梯级水电厂群日发电计划编制方法

摘要

A daily electricity generation planning method of a cascade hydropower plants is disclosed, and the method is comprised of the steps as follows: step 1, regardless of the constraints for opening and closing the generator, taking the power similarity between the power plant group and the typical demand as one of optimization objectives, and performing a first optimization to obtain a daily electricity generation plan; step 2, according to the derived daily electricity generation plan, determining an opening and closing status for the generator; and step 3, considering the constraints for opening and closing the generator, taking the power similarity between the power plant group and the typical demand as the optimization objective, performing a second optimization to obtain the daily electricity generation plan.
机译:公开了一种梯级水电站的日常发电计划方法,该方法包括以下步骤:步骤1,在考虑发电机组与发电机组之间功率相似的情况下,不受发电机开合的限制。作为优化目标之一的典型需求,并执行第一次优化以获得每日发电计划;步骤2,根据导出的每日发电计划,确定发电机的开合状态;步骤3,考虑发电机组开合的约束条件,以发电厂组与典型需求之间的功率相似度为优化目标,进行第二次优化,得出每日发电计划。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号