A method includes performing a downhole operation in a borehole in a formation. Downhole particles and drilling mud are captured at a surface from the borehole into a screen of a shaker during the downhole operation. Input power that comprises at least one of voltage, current, and leakage current being supplied to the shaker is monitored during operation of the shaker, it is determined whether the input power exceeds a threshold as a result of change in a load on the shaker. In response to determining that the input power exceeds the threshold as the result of change in the load on the shaker, it is determined that there is a kick condition in the borehole, where the kick condition comprises a condition in which a pressure of the formation exceeds a pressure in the borehole.
展开▼