首页> 外国专利> PRODUCTION SCHEDULE CHANGE SYSTEM, PRODUCTION SCHEDULE CHANGE METHOD, AND PRODUCTION SCHEDULE CHANGE PROGRAM

PRODUCTION SCHEDULE CHANGE SYSTEM, PRODUCTION SCHEDULE CHANGE METHOD, AND PRODUCTION SCHEDULE CHANGE PROGRAM

机译:生产进度变更系统,生产进度变更方法以及生产进度变更程序

摘要

A production schedule change system includes: a production schedule acquisition part configured to acquire a production schedule of a product in a case where the product is produced at an initial condition of production speed; a time information acquisition part configured to acquire time information indicating a scheduled collection time; and a schedule candidate calculation part configured to: change the production speed from the initial condition within a range defined by a quality standard of the product, based on the time information; and calculates at least one production schedule candidate satisfying a first condition that a time difference between a deliverable time of the product and the scheduled collection time is in an acceptable range and at least one of a second condition that the deliverable time is earlier than the scheduled collection time or a third condition that the scheduled collection time is earlier than the deliverable time.
机译:生产计划变更系统包括:生产计划获取部,被配置为在以生产速度的初始条件生产产品的情况下获取产品的生产计划;以及时间信息获取部分,被配置为获取指示计划的收集时间的时间信息;计划候补计算部,其根据所述时间信息,在所述产品的质量标准所规定的范围内,从初始状态变更生产速度。并计算至少一个满足第一条件的生产计划候选,该第一条件满足产品的可交付时间与计划的收集时间之间的时间差在可接受范围内,而第二条件中的至少一个满足交付时间早于计划的时间收集时间或第三个条件,即计划的收集时间早于可交付时间。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号