首页> 外国专利> Planning and Adapting Projects Based on a Buildability Analysis

Planning and Adapting Projects Based on a Buildability Analysis

机译:基于可构建性分析的计划和适应项目

摘要

Disclosed herein is a worksite automation process that involves: generating a first sequence of tasks to build the product according to a model. The process further involves causing one or more robotic devices to build the product by beginning to execute the first sequence of tasks. Further, during the execution of the first sequence of tasks, performing a buildability analysis to determine a feasibility of completing the product by executing the first sequence of tasks. Based on the analysis, determining that it is not feasible to complete the product by executing the first sequence of tasks, and in response, generating a second sequence of tasks to complete the product according to the model. Then, causing the one or more robotic devices to continue building the product by beginning to execute the second sequence of tasks.
机译:本文公开了一种工作现场自动化过程,该过程涉及:根据模型生成第一任务序列以构建产品。该过程还涉及通过开始执行第一序列任务来使一个或多个机器人设备构建产品。此外,在第一任务序列的执行期间,执行可建造性分析以确定通过执行第一任务序列来完成产品的可行性。基于该分析,通过执行第一任务序列来确定完成产品是不可行的,并根据模型生成第二任务序列以完成产品。然后,通过开始执行第二个任务序列,使一个或多个机器人设备继续构建产品。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号