首页> 外国专利> DEVICE FOR ALTERNATELY JACKING ADDED STOREY OF BUILDING WITH HIGH-STRENGTH CONCRETE COLUMNS AND STEEL SLIDEWAYS AND CONSTRUCTION METHOD THEREFOR

DEVICE FOR ALTERNATELY JACKING ADDED STOREY OF BUILDING WITH HIGH-STRENGTH CONCRETE COLUMNS AND STEEL SLIDEWAYS AND CONSTRUCTION METHOD THEREFOR

机译:高强混凝土柱钢滑道交替顶进建筑的装置及其施工方法

摘要

Disclosed are a device for alternately jacking an added storey of a building with high-strength concrete columns and steel slideways, and a construction method therefor. The device comprises a steel slideway (2) arranged on each frame column (1) and a movable steel bracket arranged on an opposite lateral circumferential surface of each frame column (1). The movable steel bracket comprises a fixed upper bracket (3) and a lifting lower bracket (4), wherein the fixed upper bracket (3) is fixed to the frame column (1), and the lifting lower bracket (4) is hung on the steel slideway (2); the lifting lower bracket (4) is provided with a jack (5); the bottom of the jack (5) is mounted at the top of the lifting lower bracket (4); and the top of the jack (5) abuts against the bottom of the fixed upper bracket (3). The construction method using the device can expand usage space under the premise of ensuring the original appearance of a building, with a short construction period and low costs.
机译:公开了一种用于交替地顶起具有高强度混凝土柱和钢质滑道的建筑物的多层的装置及其施工方法。该装置包括布置在每个框架柱(1)上的钢滑道(2)和布置在每个框架柱(1)的相对的横向周向表面上的可移动钢托架。可移动钢支架包括固定的上支架(3)和升降的下支架(4),其中,固定的上支架(3)固定在车架立柱(1)上,升降的下支架(4)悬挂在上面钢滑道(2);升降下部支架(4)设有千斤顶(5)。千斤顶(5)的底部安装在提升下支架(4)的顶部;千斤顶(5)的顶部紧靠上固定支架(3)的底部。使用该装置的施工方法可以在保证建筑物原始外观的前提下,扩大使用空间,并且施工周期短,成本低。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号