首页> 外国专利> METHOD FOR MANAGING EARTHWORK VOLUME AND FRAMEWORK VOLUME USING INTEGRATED SCHEDULE PLAN, AND PROGRAM AND COMPUTER-READABLE MEDIUM FOR EXECUTING SAME

METHOD FOR MANAGING EARTHWORK VOLUME AND FRAMEWORK VOLUME USING INTEGRATED SCHEDULE PLAN, AND PROGRAM AND COMPUTER-READABLE MEDIUM FOR EXECUTING SAME

机译:使用集成计划计划管理土方量和框架量的方法,以及用于执行该方法的程序和计算机可读介质

摘要

The present invention provides a method and a program and a computer storable medium for managing the earthwork volume and the framework volume, based on the integrated schedule plan established based on a vertical relationship and a horizontal relationship. According to the present invention, a method for managing the earthwork volume and the framework volume comprises the steps of: (a) dividing a construction work area into a plurality of zones on a horizontal basis and each zone into a plurality of sub-divisions; (b) establishing a vertical relationship for each construction in the order of earthwork, underground framing, and ground framing for each of the plurality of sub-divisions; (c) for each construction, establishing a horizontal relationship for each sub-division for the plurality of sub-divisions; (d) using both the vertical relationship and the horizontal relationship, setting a sequence of each sub-division-construction; (e) allocating the work days by a preset method for each of the set sub-division-construction; (f) receiving the start date of the first sub-division-construction, using the allocated work days for each sub-division-construction, and setting an integrated schedule detailed plan; (g) confirming the volume of all sub-divisions where earthwork is made, and dividing the volume by the number of work days of the sub-division-construction, thereby confirming the daily earthwork volume per sub-division; and (h) using an integrated schedule detailed plan, identifying sub-divisions where earthworks are made on a predetermined date, and confirming the daily earthwork volume of the confirmed sub-divisions, thereby confirming the total earthwork volume of the day.;COPYRIGHT KIPO 2020
机译:本发明提供了一种基于基于垂直关系和水平关系建立的综合调度计划来管理土方量和框架量的方法,程序和计算机可存储介质。根据本发明,一种用于管理土方量和框架量的方法包括以下步骤:(a)在水平方向上将建筑工作区域划分为多个区域,并且将每个区域划分为多个细分; (b)为多个分区中的每个分区按土方,地下框架和地面框架的顺序为每个建筑建立垂直关系; (c)对于每种构造,为多个细分的每个细分建立水平关系; (d)使用垂直关系和水平关系,设定每个细分构造的顺序; (e)通过预设方法为每个设置的细分构造分配工作日; (f)接收第一个细分工程的开始日期,使用为每个细分工程分配的工作日,并制定综合时间表详细计划; (g)确认进行土方工程的所有分区的体积,并将该体积除以该分区建筑的工作日数,从而确定每个分区的每日土方工程量; (h)使用综合时间表详细计划,确定在预定日期进行土方工程的分区,并确认已确认分区的每日土方量,从而确定当天的土方总量。 2020年

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号