首页>
外国专利>
METHOD OF CONSTRUCTION FOR WIRENET ASSEMBLY TO REINFORCE SLOPES
METHOD OF CONSTRUCTION FOR WIRENET ASSEMBLY TO REINFORCE SLOPES
展开▼
机译:钢筋网加固边坡的施工方法
展开▼
页面导航
摘要
著录项
相似文献
摘要
The construction method of the wire net assembly for reinforcing slopes of the present invention is, when the wire net formation step is completed, the rock bolt is temporarily fastened so that a plurality of rock bolts are temporarily fastened to the wire net by inserting the rock bolt into the guide ring of the main intersection part fixing tool Step and; When the rock bolt pre-fastening step is completed, connect the wire net to the desired size, combine it, and roll the wire net in a roll based on the pre-fastened rock bolt, but spread the wire net from the top of the slope to cover the slope. Settling stage; And a rock bolt separating/buriing completion step of separating the pre-fastened rock bolt and grouting it into the ground through the main intersection part fixing hole when the wire net placing step is completed; Since multiple rock bolts are provisionally fastened to the wire net, it is efficiently rolled into a roll to facilitate movement and installation. If the wire net is installed on a slope, the naturally pre-fastened rock bolts are distributed evenly and safely at the working position in the temporary fastening state. As a result, the difficulty of supply and work according to the size and weight of the rock bolt is solved to the maximum so that the operator can perform the slope work more easily and safely, while suppressing the occurrence of safety accidents. It can be installed quickly and shorten the construction period.
展开▼