首页> 外国专利> Large boiler structure dismantling process management system of power plant and method thereof

Large boiler structure dismantling process management system of power plant and method thereof

机译:电厂大型锅炉结构拆除过程管理系统及其方法

摘要

The present invention relates to dismantling of a large structure. In the present invention, in a system for managing a large structure dismantling process in a management computer connected in communication with a dismantling construction manager terminal, the management computer comprises: civil engineering and construction of a large boiler structure to be dismantled. , A complex structure analysis unit for analyzing the complex structure by generating and synthesizing structures for each field such as machinery, pipes, and ducts into 3D image drawings, and identifying interferences and overlaps of the 3D image drawings for each field; A system-specific facility information analysis unit for mapping and analyzing data of facility information for each system of civil engineering, construction, machinery, piping and ducts of a large boiler structure to be dismantled on the 3D image drawing; A detailed unit information analysis unit for using unit information based on a risk assessment in consideration of the location, weight, and environmental characteristics of a large boiler structure to be dismantled; A dismantling post-decommissioning process management unit for generating a dismantling process of a large structure as a large-medium-small-detailed process and performing a process modification according to a process execution process or data input after completion; A large structure dismantling process management system comprising a hazard information analysis unit that visually generates an analysis according to the classification of hazardous risk factors in the dismantling process of a large structure and provides it to the dismantling construction manager terminal, its method, and the large structure dismantling The construction method is presented.
机译:本发明涉及大型结构的拆卸。在本发明中,在用于管理与拆除施工管理者终端通信连接的管理计算机中的大型结构拆除过程的系统中,该管理计算机包括:土木工程和要拆除的大型锅炉结构的建造。 ,复杂结构分析单元,用于通过将诸如机械,管道和管道等每个领域的结构生成并合成为3D图像图形,并识别每个领域的3D图像图形的干扰和重叠,来分析复杂结构;一个系统专用的设施信息分析单元,用于映射和分析要在3D图像上拆除的大型锅炉结构的土木工程,建筑,机械,管道和管道的每个系统的设施信息数据;一种详细的单元信息分析单元,该单元信息分析单元基于风险评估使用单元信息,并考虑到要拆除的大型锅炉结构的位置,重量和环境特征;拆卸后退役过程管理单元,用于生成大型结构的拆卸过程,作为大中小细节过程,并根据完成后的过程执行过程或输入的数据进行过程修改;大型结构拆除过程管理系统,其包括危害信息分析单元,该视觉信息根据大型结构的拆除过程中的危险风险因素的分类直观地生成分析,并将其提供给拆除结构管理者终端,其方法和大型系统。结构拆除介绍了施工方法。

著录项

  • 公开/公告号KR102151307B1

    专利类型

  • 公开/公告日2020-09-02

    原文格式PDF

  • 申请/专利权人 (주) 플랜디 글로벌;

    申请/专利号KR20180094391

  • 发明设计人 서동민;

    申请日2018-08-13

  • 分类号G06Q50/08;G06F30;G06Q10/06;

  • 国家 KR

  • 入库时间 2022-08-21 11:03:55

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号