首页>
外国专利>
Ground improvement structure and construction method using grout material forming a gap with the ground
Ground improvement structure and construction method using grout material forming a gap with the ground
展开▼
机译:利用砂浆材料与地面形成缝隙的地面改良结构和施工方法
展开▼
页面导航
摘要
著录项
相似文献
摘要
The present invention is formed by the injection of grout material in multiple stages into the ground, and the bulbs embedded while forming a space in the ground; A buried pipe that has a hollow formed so that the grout material is injected to form the bulbs, and connects the ground and the bulbs to transmit the overhead load to the bulbs; It relates to a ground improvement structure using a ground-spaced bulb, characterized in that it comprises; a mounting portion fastened to the upper end of the buried pipe and mounted on the ground.
展开▼