首页> 外国专利> METHOD FOR FORCED REDUCTION OF TEMPERATURE OF PERMANENTLY FROZEN GROUND IN BASES OF PIPE FOUNDATIONS OF OPERATED BRIDGE

METHOD FOR FORCED REDUCTION OF TEMPERATURE OF PERMANENTLY FROZEN GROUND IN BASES OF PIPE FOUNDATIONS OF OPERATED BRIDGE

机译:桥梁桥基管中永久冻结地面温度的强制降低方法

摘要

FIELD: construction.SUBSTANCE: invention relates to operation of permanent bridges on permafrost soils and can be used for permanent operated bridges with pile foundations, permafrost bases of which are used according to principle I. Method of forced lowering of permafrost soil temperature in bases of pile foundation foundations of operated bridge is performed with cold atmospheric air. Barrels of seasonal-action cooling devices (SCD) are blown by cold air from an air turbo-refrigerating machine after complete pumping of liquid coolant therefrom, which is again poured into boreholes of SCD after bases have reached calculated negative temperature values.EFFECT: technical result consists in provision of forced lowering to design negative temperature values of permafrost soil in bases of pile foundation foundations of operated axle without changing structures of foundations and depth of piles immersion into thickness of permafrost soil of bases.1 cl, 3 dwg
机译:用于永久性冻土的永久性桥梁技术领域本发明涉及永久性冻土在永久性土壤上的操作,并可用于具有桩基的永久性操作的桥梁,该永久性冻土根据原则I使用永久性冻土基础。运营桥梁的桩基基础是在寒冷的大气中进行的。桶装的季节性冷却装置(SCD)在完全从中抽出液态冷却剂后,用空气涡轮制冷机中的冷空气吹出,然后在底座达到计算出的负温度值后再次倒入SCD的孔中。结果是在不改变地基结构和桩深浸入基础永冻土厚度的情况下,提供了强制降低设计的可操作轴桩基础的永冻土负温度值的功能。1 cl,3 dwg

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号