首页> 外国专利> METHOD OF DEVELOPMENT AND OPERATION OF WELLS WITH USE OF DISSOLVED GAS AND INSTALLATION OF INSTALLATION FOR IMPLEMENTATION THEREOF

METHOD OF DEVELOPMENT AND OPERATION OF WELLS WITH USE OF DISSOLVED GAS AND INSTALLATION OF INSTALLATION FOR IMPLEMENTATION THEREOF

机译:使用溶解的天然气开发和运营井的方法以及为实现井的安装而进行的安装

摘要

FIELD: soil or rock drilling; mining.;SUBSTANCE: group of inventions relates to a method of development and operation of wells using dissolved gas and a method of mounting an installation for its implementation. Method involves accumulation of gas released from the gassed fluid at least under one packer to bypass pressure exceeding the pressure inside the tubing string. Accumulated gas is bypassed via bypass device or device from under packer inside tubing string. Additionally, at least one acoustic radiator is forced by forced release of gas from the gassy fluid at least under one bypass device with possibility of regulation and control of the process of forced release of gas depending on supplied power of the signal from the acoustic generator. At that intensity of gas accumulation under packer is changed. For this purpose, inclusion of emitters is performed simultaneously or in series, thereby controlling intensity of forced release of gas. At least one acoustic radiator is switched on or off periodically for a given period of time or according to a predetermined program. Volume of forced gas is pre-set by adjusting the distance between packer and productive formation, increasing or decreasing it. First, depth interval or specified depth of packer arrangement is defined with possibility of creating volume of under-packer space for gas accumulation with preset bypass pressure. Bypass of forced gas is performed periodically with possibility of periodical development of well during its operation. Depending on the amount of dissolved gas in the gassy fluid, the number of acoustic emitters in the apparatus is determined.;EFFECT: technical result is increased intensity of development and efficiency of operation of production wells, especially gas lift and fountain, due to increased inflow of carbonated fluid from formation at forced release of dissolved gas and its accumulation in sub-packer zone.;21 cl, 7 dwg
机译:领域:土壤或岩石钻探;发明领域:本发明涉及一种使用溶解气体的井的开发和操作方法,以及一种用于实现该方法的安装设备的方法。该方法涉及至少在一个封隔器下从充气流体中释放的气体蓄积,以绕过超过管柱内部压力的压力。累积的气体通过旁路装置或从管柱内部的封隔器下方旁路的装置。另外,至少一个声辐射器至少在一个旁通装置下通过从气态流体中强制释放气体而被迫,并且有可能根据来自声发生器的信号的供给功率来调节和控制强制释放气体的过程。在此情况下,封隔器下的气体聚集强度发生变化。为此目的,同时或串联地执行发射器的包含,从而控制强制释放气体的强度。至少一个声辐射器在给定的时间段内或根据预定程序周期性地打开或关闭。通过调节封隔器与生产性地层之间的距离(增加或减少)来预设强制气体的体积。首先,定义深度间隔或封隔器布置的指定深度,以在预设的旁路压力下为气体蓄积创造封隔器下方空间的可能性。强制性气体的旁路是定期进行的,并可能在其运行期间井的周期性发展。取决于气态流体中溶解的气体量,确定设备中的声发射器的数量。效果:技术成果是由于增加了开发井的强度和生产井的操作效率,特别是气举和喷泉强迫释放溶解气体时地层中的碳酸流体流入,并在次封隔层中聚集; 21 cl,7 dwg

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号