首页> 外国专利> Construction Method of Multi Floor Tower Fusion Hanok Framework Made of Steel Beam

Construction Method of Multi Floor Tower Fusion Hanok Framework Made of Steel Beam

机译:钢梁多层楼塔融合韩屋框架的施工方法

摘要

The present invention relates to a method of constructing a multi-layered tower-type fusion hanok frame, and more specifically, by using a steel material to allow construction of a multi-layered tower-type fusion hanok frame with a narrower floor area toward the upper side, space utilization of each layer It relates to a method of constructing a multi-layered tower-type fusion hanok frame that can reduce labor and material costs, increase stability against fire and earthquake, and maintain the appearance of hanok.
机译:本发明涉及一种构造多层塔式融合韩屋框架的方法,更具体地讲,涉及通过使用钢材来构造朝着所述建筑的更窄的地板面积的多层塔式融合韩屋框架的方法。上部,各层的空间利用率本发明涉及一种构造多层塔式融合韩屋框架的方法,该框架可以减少劳力和材料成本,提高防火和抗震的稳定性,并保持韩屋的外观。

著录项

  • 公开/公告号KR1020200082863A

    专利类型

  • 公开/公告日2020-07-08

    原文格式PDF

  • 申请/专利权人 김진우;

    申请/专利号KR1020180173862

  • 发明设计人 김진우;

    申请日2018-12-31

  • 分类号

  • 国家 KR

  • 入库时间 2022-08-21 10:56:10

相似文献

  • 专利
  • 外文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号