The invention relates to the field of construction, particularly to the erection of tall towers having mechanical equipment mounted on the tops thereof. The present method of installing towers consists in simultaneously installing a lower part of a tower on a base using a hoisting crane, and installing winches and a platform having a hoisting crane next to the tower, abutting the tower, after which the platform with the crane is lifted to the upper area of the lower part of the tower along guides on the outer surface of the lower part of the tower using the winches, and the subsequent parts of the tower are installed by moving the platform onto the upper part of the assembled part of the tower until the full height is reached, and a wind power unit having blades is installed using the crane on the platform.

著录项

  • 公开/公告号EP3670789A1

    专利类型

  • 公开/公告日2020.06.24

    原文格式PDF

  • 申请/专利权人

    申请/专利号EP18918272.8

  • 发明设计人

    申请日2018.11.02

  • 分类号

  • 国家 EP

  • 入库时间 2022-08-21 10:53:05

相似文献

  • 专利
  • 外文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号