首页> 外文OA文献 >Drivers of the accuracy of developers' early stage cost estimates in residential construction
【2h】

Drivers of the accuracy of developers' early stage cost estimates in residential construction

机译:住宅建设中开发商早期成本估算准确性的驱动因素

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

Purposeud– Preliminary cost estimates for construction projects are often the basis of financial feasibility and budgeting decisions in the early stages of planning and for effective project control, monitoring and execution. The purpose of this paper is to identify and better understand the cost drivers and factors that contribute to the accuracy of estimates in residential construction projects from the developers’ perspective.ududDesign/methodology/approachud– The paper uses a literature review to determine the drivers that affect the accuracy of developers’ early stage cost estimates and the factors influencing the construction costs of residential construction projects. It used cost variance data and other supporting documentation collected from two case study projects in South East Queensland, Australia, along with semi-structured interviews conducted with the practitioners involved.ududFindingsud– It is found that many cost drivers or factors of cost uncertainty identified in the literature for large-scale projects are not as apparent and relevant for developers’ small-scale residential construction projects. Specifically, the certainty and completeness of project-specific information, suitability of historical cost data, contingency allowances, methods of estimating and the estimator’s level of experience significantly affect the accuracy of cost estimates. Developers of small-scale residential projects use pre-established and suitably priced bills of quantities as the prime estimating method, which is considered to be the most efficient and accurate method for standard house designs. However, this method needs to be backed with the expertise and experience of the estimator.ududOriginality/valueud– There is a lack of research on the accuracy of developers’ early stage cost estimates and the relevance and applicability of cost drivers and factors in the residential construction projects. This research has practical significance for improving the accuracy of such preliminary cost estimates.
机译:目的 ud –建设项目的初步成本估算通常是规划初期以及进行有效项目控制,监控和执行的财务可行性和预算决策的基础。本文的目的是从开发商的角度识别并更好地理解影响住宅建设项目估算准确性的成本动因和因素。 ud udDesign / methodology / approach ud–本文使用文献综述确定影响开发商早期阶段成本估算准确性的因素以及影响住宅建设项目建设成本的因素。它使用了从澳大利亚昆士兰州东南部的两个案例研究项目中收集的成本差异数据和其他支持文档,以及与相关从业人员进行的半结构化访谈。 ud udFindings ud–发现许多成本动因或因素对于大型项目,文献中确定的成本不确定性并不明显,与开发商的小型住宅建设项目相关。具体而言,专案专用信息的确定性和完整性,历史成本数据的适用性,应急准备金,估算方法以及估算者的经验水平会严重影响成本估算的准确性。小型住宅项目的开发商使用预先建立并定价合理的数量清单作为主要估算方法,这被认为是标准房屋设计的最有效,最准确的方法。但是,此方法需要以估算者的专业知识和经验为后盾。 ud ud原始性/值 ud–缺乏对开发人员早期成本估算的准确性以及成本驱动因素的相关性和适用性的研究住宅建设项目中的因素。这项研究对于提高此类初步成本估算的准确性具有实际意义。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
代理获取

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号