首页> 外文OA文献 >DETERMINATION OF THE RATIONAL LENGTH OF THE BLOCK ALONG THE STRIKE FOR EXPANSION TO PROVIDE SAFETY AND EFFICIENCY IN THE WORKING OF THE MEDIUM THICK IN-CLINED COAL SEAMS WITH THE ROOM AND PILLAR SYSTEM IN THE QUANG NINH COAL BASIN
【2h】

DETERMINATION OF THE RATIONAL LENGTH OF THE BLOCK ALONG THE STRIKE FOR EXPANSION TO PROVIDE SAFETY AND EFFICIENCY IN THE WORKING OF THE MEDIUM THICK IN-CLINED COAL SEAMS WITH THE ROOM AND PILLAR SYSTEM IN THE QUANG NINH COAL BASIN

机译:沿着膨胀的抗撞率测定块的合理长度,为Quang Ninh煤盆中的房间和支柱系统提供安全和效率。

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

An analysis of appropriateness of room-and-pillar method for extracting medium-thick inclined coal seams in Quang Ninh Coal Basin taking into account existing mining and geological conditions was carried out. Corresponding foreign experience of applying room-and-pillar method was considered in relation to the mines of Vietnam. Process flow sheet of first mining and extraction of medium-thick inclined coal seams by room-and-pillar method in complicated mining and geological conditions was developed, and optimal block length along the strike to provide the production safety and efficiency was determined.
机译:考虑到现有采矿和地质条件的克南煤盆中中厚倾斜煤接缝室内厚度煤层的适当性分析。关于越南地雷的应用,相应的外国外国体验应用室内和支柱方法。通过室内和支柱方法在复杂的采矿和地质条件下进行中厚倾斜煤接缝的第一次采矿和提取的工艺流程和提取,并确定沿罢工的最佳块长度,以提供生产安全性和效率。

著录项

相似文献

  • 外文文献
  • 专利
代理获取

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号