首页>
外文OA文献
>DETERMINATION OF THE RATIONAL LENGTH OF THE BLOCK ALONG THE STRIKE FOR EXPANSION TO PROVIDE SAFETY AND EFFICIENCY IN THE WORKING OF THE MEDIUM THICK IN-CLINED COAL SEAMS WITH THE ROOM AND PILLAR SYSTEM IN THE QUANG NINH COAL BASIN
【2h】
DETERMINATION OF THE RATIONAL LENGTH OF THE BLOCK ALONG THE STRIKE FOR EXPANSION TO PROVIDE SAFETY AND EFFICIENCY IN THE WORKING OF THE MEDIUM THICK IN-CLINED COAL SEAMS WITH THE ROOM AND PILLAR SYSTEM IN THE QUANG NINH COAL BASIN
An analysis of appropriateness of room-and-pillar method for extracting medium-thick inclined coal seams in Quang Ninh Coal Basin taking into account existing mining and geological conditions was carried out. Corresponding foreign experience of applying room-and-pillar method was considered in relation to the mines of Vietnam. Process flow sheet of first mining and extraction of medium-thick inclined coal seams by room-and-pillar method in complicated mining and geological conditions was developed, and optimal block length along the strike to provide the production safety and efficiency was determined.
展开▼