首页> 美国政府科技报告 >Examination of the Modified Water Deliveries Project, the C-111 Project, and the Experimental Water Deliveries Project: Hydrologic Analyses and Effects on Endangered Species
【24h】

Examination of the Modified Water Deliveries Project, the C-111 Project, and the Experimental Water Deliveries Project: Hydrologic Analyses and Effects on Endangered Species

机译:修改水输送项目,C-111项目和实验水交付项目的审查:水文分析和对濒危物种的影响

获取原文

摘要

The Everglades National Park has as one of its primary management objectives the preservation and restoration of sustainable Everglades ecosystems (Everglades National Park, 1993). The South Florida Natural Resources Center (SFNRC) at Everglades National Park is charged with reviewing and assessing appropriate information on the status and trends of the natural resources on Park Service lands to determine if progress towards this objective isorts to bring about ecosystem restoration. This report provides information about the Program of Experimental Water Deliveries to Everglades National Park, the Modied Water Deliveries, and the C-111 Project relevant to National Park Service objectives for hydrologic and ecologic restoration of Everglades National Park. In addition, the report represents the National Park Service to provide some technical assistance as part of the U.S. Fish and Wildlife Service's reconsultation pursuant to Section 7 of the Endangered Species Act (16 U.S.C. 1536).

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号