首页> 美国政府科技报告 >Phosphorus Control Action Plan and Total Maximum Daily (Annual Phosphorus) Load Report: Togus (Worromontogus) Pond, Kennebec County, Maine. Togus (Worromontogus) Pond PCAP-TMDL Report, Maine DEPL 2005-0702.
【24h】

Phosphorus Control Action Plan and Total Maximum Daily (Annual Phosphorus) Load Report: Togus (Worromontogus) Pond, Kennebec County, Maine. Togus (Worromontogus) Pond PCAP-TMDL Report, Maine DEPL 2005-0702.

机译:磷控制行动计划和每日总磷(年磷)负荷报告:Togus(Worromontogus)池塘,缅因州肯纳贝克县。 Togus(Worromontogus)池塘pCap-TmDL报告,缅因州DEpL 2005-0702。

获取原文

摘要

The objectives of this project were twofold: First, a comprehensive land use inventory was undertaken to assist Maine DEP in developing a Phosphorus Control Action Plan (PCAP) and a Total Maximum Daily Load (TMDL) report for the Little Cobbossee Lake watershed. Simply stated, a TMDL is the total amount of phosphorus that a lake can receive without harming water quality. Maine DEP, with assistance from the MACD Project Team, will address and incorporate public comments before final submission to the US EPA. Secondly, watershed survey work, including a shoreline and septic survey evaluation, was conducted by the Cobbossee Watershed District to help assess total phosphorus reduction techniques that would be beneficial for the Little Cobbossee Lake watershed. Watershed survey work included assessing direct drainage nonpoint source (NPS) pollution sites, inclusive of recommendations for future conservation work in the watershed to help citizens, organizations, and agencies restore and protect Little Cobbossee Lake.

著录项

相似文献

  • 外文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号