首页> 美国政府科技报告 >Sediment Loads and Transport at Constructed Chutes along the Missouri River—Upper Hamburg Chute near Nebraska City, Nebraska, and Kansas Chute near Peru, Nebraska, 2012.
【24h】

Sediment Loads and Transport at Constructed Chutes along the Missouri River—Upper Hamburg Chute near Nebraska City, Nebraska, and Kansas Chute near Peru, Nebraska, 2012.

机译:沉积物负荷和运输在沿密苏里河 - 上部汉堡滑道的建造的滑道附近内布拉斯加市,内布拉斯加和堪萨斯滑道附近秘鲁,内布拉斯加,2012年。

获取原文

摘要

The U.S. Geological Survey, in cooperation with the U.S. Army Corps of Engineers, monitored suspended sediment within constructed Missouri River chutes during March through October 2012. Chutes were constructed at selected river bends by the U.S. Army Corps of Engineers to help mitigate aquatic habitat lost through the creation and maintenance of the navigation channel on the Missouri River.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号