首页> 美国政府科技报告 >Reclamation Managing Water in the West: Value Planning-Cle Elum Dam Fish Passage Facility, Yakima Project, Washington. A-10-1953-6903-100-00-0-0 (Cle Elum VE)
【24h】

Reclamation Managing Water in the West: Value Planning-Cle Elum Dam Fish Passage Facility, Yakima Project, Washington. A-10-1953-6903-100-00-0-0 (Cle Elum VE)

机译:填海工程西部管理:价值规划 - Cle Elum Dam Fish passage Facility,亚基马项目,华盛顿。 a-10-1953-6903-100-00-0-0(Cle Elum VE)

获取原文

摘要

The Value Study Team met beginning on June 8, 2009, for a 5-day study of the Cle Elum Dam Fish Passage project. The estimated cost of the baseline concept is $53,707,000 (not including mobilization, unlisted items, or contingencies). The Team developed 6 proposals, which are summarized (in random order) below. If all the cost avoidance proposals are accepted, their maximum cost avoidance potential is $36,086,000. Note that in calculating the maximum potential cost avoidance, the cost of the study ($50,000) was deducted only once.

著录项

相似文献

  • 外文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号