首页> 美国政府科技报告 >Record of Decision for the Electrical Interconnection of the Golden Hills Wind Project
【24h】

Record of Decision for the Electrical Interconnection of the Golden Hills Wind Project

机译:金山风电项目电气互联决策记录

获取原文

摘要

Bonneville Power Administration (BPA) has decided to offer contract terms for interconnection of up to 200 megawatts (MW) of power to be generated by the proposed Golden Hills Wind Project (Wind Project) into the Federal Columbia River Transmission System (FCRTS). BP Alternative Energy North America, Inc. (a subsidiary of BP America Production Company) proposes to construct and operate the proposed Wind Project in Sherman County, Oregon, and has requested interconnection to the FCRTS. Interconnection will be at the existing Biglow Canyon Substation in Sherman County, Oregon.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号