首页> 美国政府科技报告 >Installation of Incinerator Residue as Base-Course Paving Material in Washington, DC
【24h】

Installation of Incinerator Residue as Base-Course Paving Material in Washington, DC

机译:在华盛顿特区安装焚烧炉残渣作为基层铺路材料

获取原文

摘要

The use of municipal incinerator residue as aggregate in bituminous pavement construction was evaluated in the laboratory and in the field. A test installation, placed in Washington, D.C. in June 1977, consisted of a 4 1/2-in.(114.3mm) bituminous pavement composed largely of incinerator residue. The base was placed in two lifts and finished over compacted subgrade. The base was covered with 1 1/2-inches (38.1 mm) of a conventional bituminous srface course mixture. Details of the residue production, laboratory evaluation, asphalt plant operation, placement and finishing of the test installation, and recommendations and precautions for future projects using incinerator residue are given in this report. Preliminary results indicate that, with proper precautions, incinerator residue can be used as aggregate substitute or extender in bituminous base construction. However, even though it may be a technically viable aggregate material, its use will be determined by an interplay of economic, environmental, and energy factors.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号