首页> 美国政府科技报告 >Procedures for Hoist and Shaft Inspection and Maintenance. Volume II. Inspection and Maintenance Procedures
【24h】

Procedures for Hoist and Shaft Inspection and Maintenance. Volume II. Inspection and Maintenance Procedures

机译:提升机和轴检查和维护程序。第二卷。检查和维护程序

获取原文

摘要

This report discusses in general terms scheduled inspection and preventative maintenance of the hoists and ancilliary equipment described in volume I. Preventative scheduled inspection and maintenance procedures assist in the smooth operation of mine hoisting systems by the prevention of unscheduled or catastrophic equipment failure and its attendant downtime. Schedules and overall maintenance planning is required at the management level. Inspection, maintenance, and unusual operations or incidents must be recorded in records and equipment logs. A cross reference between MSHA regulations and various equipment components is included as part of the report. A discussion of the various nondestructive testing methods that may be applied to hoisting equipment is also included.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号