首页> 美国政府科技报告 >Gorton Pond, Warwick, Rhode Island Lake Restoration Project. Phase 1. Diagnostic/Feasibility Study
【24h】

Gorton Pond, Warwick, Rhode Island Lake Restoration Project. Phase 1. Diagnostic/Feasibility Study

机译:戈尔顿池塘,沃里克,罗德岛湖泊修复项目。阶段1.诊断/可行性研究

获取原文

摘要

Urban land use practices within the watershed have resulted in the transport of excessive sediments and nutrients into Gorton Pond. These events have set the stage for the present eutrophication problem which is manifested primarily as an algal bloom problem, and secondarily as a weed infestation and shoaling problem. Disturbance of the slope vegetation and/or the release of storm water at the top of the slope is usually enough to create a severe erosion problem if left unchecked. To these effects must be added those of street sanding and normal sediment and pollutant build-up on urban surfaces and in hydraulic structures. In addition to the erosion and sedimentation problems plaguing Gorton Pond, a relatively high loading of nutrients has entered Gorton Pond due to the septic system discharges. A full year of monitoring and analysis has demonstrated that excessive levels of nitrogen and phosphorus are present at all times in Gorton Pond water column and are derived principally from storm water, septic system discharges, and release from bottom sediments during overturn. A restoration plan is proposed.

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号