首页> 美国政府科技报告 >Technical Memorandum 33-523 Volume Ⅱ Tracking and Data System Support For the Mariner Mars 1971 Mission First Trajectory Correction Maneuver through Orbit Insertion
【24h】

Technical Memorandum 33-523 Volume Ⅱ Tracking and Data System Support For the Mariner Mars 1971 Mission First Trajectory Correction Maneuver through Orbit Insertion

机译:技术备忘录33-523第二卷跟踪和数据系统支持mariner mars 1971任务第一次轨道修正机动通过轨道插入

获取原文

摘要

This document contains the Deep Space Tracking and Data System activities in support of the Mariner Mars 1971 Project from the first trajectory correction maneuver on June 4, 1971, through cruise and orbit insertion on November 14, 1971. Included are presentations of the changes and updates to the TDS requirements and to the plan and configuration plus detailed information on the TDS flight support performance evaluation and the preorbltal testing and training during this report period.nWith the loss of Mariner 8 at launch, a few changes to the Mariner Mars 1971 requirements, plan, and configuration were necessitated. Mariner 9 is now assuming the former mission plan of Mariner 8, including the TV mapping cycles and a 12-hr orbital period.

著录项

相似文献

  • 外文文献
  • 中文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号