首页> 美国政府科技报告 >Upgrade Precision Runway Monitor (PRM) Operational Test and Evaluation (OT/E)Test Plan
【24h】

Upgrade Precision Runway Monitor (PRM) Operational Test and Evaluation (OT/E)Test Plan

机译:升级精密跑道监控(pRm)运行测试和评估(OT / E)测试计划

获取原文

摘要

The Upgrade Precision Runway Monitor (Upgrade PRM) Operational and Integrationtests are defined that will be conducted at the Federal Aviation Administration (FAA) Operational facilities. These tests will be executed at Raleigh-Durham Airport (RDU) following the Contractor Site Acceptance Test. The Upgrade PRM test configuration is addressed in conjunction with the associated interfaces which will be required to perform the testing in as near an operational environment as possible. The Air Traffic (AT) Operational requirements and test objectives are contained in this test plan. In addition to providing requirements traceability, this plan contains a description of the tests which will be executed, associated success criteria, roles and responsibilities of test personnel, and the overall flow of activities required for a successful test program.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号