首页> 美国政府科技报告 >Project Columbiad: Mission to the Moon. Book 1: Executive Summary. Volume 1:Mission Trade Studies and Requirements. Volume 2: Subsystem Trade Studies and Selection
【24h】

Project Columbiad: Mission to the Moon. Book 1: Executive Summary. Volume 1:Mission Trade Studies and Requirements. Volume 2: Subsystem Trade Studies and Selection

机译:哥伦比亚项目:月球任务。第1册:执行摘要。第1卷:任务贸易研究和要求。第2卷:子系统贸易研究和选择

获取原文

摘要

In response to the Report of the Advisory Committee on the future of the U.S.Space Program and a request from NASA's Exploration Office, the MIT Hunsaker Aerospace Corporation (HAC) conducted a feasibility study, known as Project Columbiad, on reestablishing human presence on the Moon before the year 2000. The mission criteria established were to transport a four person crew to the lunar surface at any latitude and back to Earth with a 14-28 day stay on the lunar surface. Safety followed by cost of the Columbiad Mission were the top level priorities of HAC. The resulting design has a precursor mission that emplaces the required surface payloads before the piloted mission arrives. Both the precursor and piloted missions require two National Launch System (NLS) launches. Both the precursor and piloted mission have an Earth orbit rendezvous (EOR) with a direct transit to the Moon post-EOR. The piloted mission returns to Earth via a direct transit. Included among the surface payloads preemplaced are a habitat, solar power plant (including fuel cells for the lunar night), lunar rover, and mechanisms used to cover the habitat with regolith (lunar soil) in order to protect the crew members from severe solar flare radiation.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号