首页> 美国政府科技报告 >Saturn S-2 quality assurance techniques: Nondestructive testing processes. Volume 1: Requirements and procedures
【24h】

Saturn S-2 quality assurance techniques: Nondestructive testing processes. Volume 1: Requirements and procedures

机译:土星s-2质量保证技术:无损检测流程。第1卷:要求和程序

获取原文

摘要

The methods and procedures used to perform nondestructive testing inspections of the Saturn S-2 liquid hydrogen and liquid oxygen tank weldments during fabrication and after proof testing are described to document special skills developed during the program. All post-test inspection requirements are outlined including radiographic inspections procedures.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号