首页> 美国政府科技报告 >High power switch design for the Nova upgrade laser (Project Hercules). Final report, August 15, 1991--May 31, 1993
【24h】

High power switch design for the Nova upgrade laser (Project Hercules). Final report, August 15, 1991--May 31, 1993

机译:Nova升级激光器(project Hercules)的高功率开关设计。最终报告,1991年8月15日 - 1993年5月31日

获取原文

摘要

A test facility has been constructed to test high power ignitrons using an electrolytic bank. The goal of this project, which was named Hercules (High Energy Research Concerning the Ultimate Lifetime of Experimental Switches), was to test the lifetime and switching characteristics of high power ignitrons for Lawrence Livermore's laser upgrade program. The main tubes of interest that have been tested were the NL-9000A from Richardson Electronics, and the BK-1002 from English Electric Valve (EEV). Both tubes have stainless steel, cup style anodes. Both tubes were connected in series for the tests. Required test parameters were Ipeak = 300 kA, and Qtransfer = 200 C. During the tests, the BK-1002 tube failed due to ignitor shorting. The average forward voltage drop across the EEV tube was almost twice than the drop across the NL-9000A. After the tube failure, the BK-1002 was replaced by a NL-1057 to continue testing of the NL-9000A.

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号